≥1.67
Air tightness testing; Functional testing; CMK
15sec/part
Cycle Time
Introduction
This equipment is used for throttle valve production, assembly quality inspection, and product performance testing. The production process involves laser marking of the shell; c-shim, Center shaft, bushing, bushing pressing and oiling; Spring PIN press fit; Disc pressing and screwing; Assembly of fan teeth and their torque springs; Magnet assembly, dispensing, curing; Motor assembly and locking screw point grease; COVER, POT, Buckle assembly; Air tightness testing; Final inspection, etc. The production line fully considered the compatibility of the customer's 5 series products and their updates during the design process.
Highlights
- The equipment structure is compact. The production line uses five 4-station indexing discs and three 6-station indexing discs, integrating many workstations into one workstation.
- High degree of automation. All parts are automatically installed and inspected for installation quality. The production line uses two 4-axis robots and three collaborative robots to achieve product assembly and transportation.
- High safety standards. The production line is designed according to European safety standards.
- Advanced production technology. All production lines are equipped with automatic and semi-automatic production operations, and the production equipment is highly intelligent, making it easy for operators to operate
Parameters
- Cycle Time: 15 sec/part;
- Stable Axle Pressing Depth: CMK≥1.67;
- Stable Lining Pressing Depth: CMK≥1.67;
- Stable Spring Pin Pressing Depth: CMK≥1.67;
- Stable Motor Screw Tightening Torque and Depth: CMK≥1.67;
- Stable Fan Tooth Angle Adjustment System and Flatness Detection: CMK≥1.67;
- Maximum Magnet Assembly Force: 180N;
- Perform MSA on product leakage rate, R&R<10%, 50 samples;
Perform MSA by closing the gas flow rate in the dead position, R&R<10%, 50 samples; - Perform MSA for free position gas flow rate, R&R<10%, 50 samples.
Get a solution now
We will tailor an exclusive project plan for you by assessing your business needs, reviewing the current project status, and analyzing your competitors in the industry.
"*" indicates required fields