Passed 300+ strict tests of TÜV SÜD
Electromagnetic compatibility darkroom
Shielded Enclosure
The static immunity test results meet IEC61000-4.2 requirements
The conducted disturbance test conforms to IEC61800-3/GB12668.3 requirements
High acceleration life test, dust test, mechanical vibration and impact test
Temperature/humidity test, thermal shock test, salt spray test
Passed 300+ strict tests of TÜV SÜD
Products Highlights
- Less Heat Generation, More Reliable
Attribute to copper coils, motor is with higher power density and less heat generation compared to PCB coils. - Ready Upon Startup, High-Speed Production
Real-time recognition of mover lD. Compared to RFlD solutions, no one cycle of mover running is required before production. - Distributed Parallel Debugging to Accelerate Production
Parallel debugging with multi-terminal makes the commissioning on a long transport line more convenient, and greatly reduces equipment integration time. Ensuring dual safety through reliable software control permissions and robust mechanical limits. - Defect Detection, Efficient Scheduling
Defective products can be directly sent to the unloading station once detected. This can improve the production efficiency while saving the production cost. - Visual Scenario Creation, What You See ls What You Get
Supporting offline/online graphical scenario creation. - Smart Simulation Used for Anticipated Operation
Smart simulation system enhances the confidence on the physical system behavior and performance, and provides the data for the system optimization.
Get a solution now
We will tailor an exclusive project plan for you by assessing your business needs, reviewing the current project status, and analyzing your competitors in the industry.
"*" indicates required fields